BDX were engaged by Link Alliance to design and fabricate a heavy duty structural steel seal ring which is an integral part of the tunnel boring operation on Auckland’s City Rail Link. The 8m diameter ring was fabricated from rolled 300PFC channel and had to be within 2mm tolerance overall to ensure the tunnel boring machine ‘Dame Whina Cooper’ could safely break through out of the rock and into the station.
Having BDX by your side future proofs your business. You can rest assured knowing that one of your biggest assets is being looked after by the best heavy diesel mechanics in the industry. We are committed when it comes to building long term relationships with local businesses who deserve best in class mechanical support.
Made with ❤️ by 1768degrees.com. Helping Entrepreneurs Grow.
Built on Aotearoaweb.com.