BDX have been engaged by Whangarei District Council to fully refurbish a historic rail bridge that was originally constructed in 1903 and install it alongside SH1 north of Whangarei as part of the Kamo Shared Path project. The works involve repairing damaged sections, installing a new deck, designing and fabricating a compliant handrail system, protective coatings and installation. Once complete the bridge will be transported to site and lifted into place in 2 sections using a 400T mobile crane.
Having BDX by your side future proofs your business. You can rest assured knowing that one of your biggest assets is being looked after by the best heavy diesel mechanics in the industry. We are committed when it comes to building long term relationships with local businesses who deserve best in class mechanical support.
Made with ❤️ by 1768degrees.com. Helping Entrepreneurs Grow.
Built on Aotearoaweb.com.